Share:

NFA X015 over INDUST. ACCESS RD / I-55

Map 

Coordinates:
+35.10889, -90.07556
35°06'32" N, 90°04'32" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:NFA X015 over INDUST. ACCESS RD / I-55
Structure number:79I00550077
Location:INDUST ACCESS RD-MEMPHIS
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:56.1 ft. [17.1 m]
Total length:116.1 ft. [35.4 m]
Roadway width between curbs:16.1 ft. [4.9 m]
Deck width edge-to-edge:24.0 ft. [7.3 m]
Vertical clearance below bridge:16.7 ft. [5.1 m]
Skew angle:10°
Owner:State Highway Agency [01]
Year built:1961
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:100 [as of 2010]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:70.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,142,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:100 [as of 2000]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:77.4
Recommended work:Widening of existing bridge or other major structure without deck rehabilitation or replacement [33]
Estimated cost of work:$106,000

1992 Inspection 

Average daily traffic:39,600 [as of 1991]