NFA X015 over INDUST. ACCESS RD / I-55
Map
Coordinates:
+35.10889, -90.0755635°06'32" N, 90°04'32" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | NFA X015 over INDUST. ACCESS RD / I-55 |
| Structure number: | 79I00550077 |
| Location: | INDUST ACCESS RD-MEMPHIS |
| Purpose: | Carries highway and pedestrian walkway over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 56.1 ft. [17.1 m] |
| Total length: | 116.1 ft. [35.4 m] |
| Roadway width between curbs: | 16.1 ft. [4.9 m] |
| Deck width edge-to-edge: | 24.0 ft. [7.3 m] |
| Vertical clearance below bridge: | 16.7 ft. [5.1 m] |
| Skew angle: | 10° |
| Owner: | State Highway Agency [01] |
| Year built: | 1961 |
| Historic significance: | Historical significance is not determinable at this time [4] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 2 |
| Main spans material: | Prestressed concrete [5] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 100 [as of 2010] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 70.3 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $1,142,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 100 [as of 2000] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 77.4 |
| Recommended work: | Widening of existing bridge or other major structure without deck rehabilitation or replacement [33] |
| Estimated cost of work: | $106,000 |
1992 Inspection
| Average daily traffic: | 39,600 [as of 1991] |