Share:

FAP 3 over I240 & RAMPS

Map 

Coordinates:
+35.00417, -90.02333
35°00'15" N, 90°01'24" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:FAP 3 over I240 & RAMPS
Structure number:79I02400015
Location:SR-3 / I-240 JCT.
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:116.1 ft. [35.4 m]
Total length:306.4 ft. [93.4 m]
Roadway width between curbs:64.0 ft. [19.5 m]
Deck width edge-to-edge:78.1 ft. [23.8 m]
Vertical clearance below bridge:15.7 ft. [4.8 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1969
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:39,150 [as of 2009]
Truck traffic:3% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:56.4 tons [51.3 metric tons]
Inventory rating:33.7 tons [30.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:58.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$7,891,000

2000 Inspection 

Average daily traffic:61,750 [as of 1999]
Truck traffic:2% of total traffic
Evaluation:Not applicable [N]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:37,780 [as of 1991]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:74.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,473,000