I-240 SB over I240-SB / CENTRAL AVE

Map 

Coordinates:
+35.12694, -90.02389
35°07'37" N, 90°01'26" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-240 SB over I240-SB / CENTRAL AVE
Structure number:79I02400033
Location:0.26 MI. S OF SR-4 JCT.
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:64.0 ft. [19.5 m]
Total length:155.8 ft. [47.5 m]
Roadway width between curbs:48.2 ft. [14.7 m]
Deck width edge-to-edge:52.5 ft. [16.0 m]
Vertical clearance below bridge:15.1 ft. [4.6 m]
Skew angle:14°
Owner:State Highway Agency [01]
Year built:1966
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:99,840 [as of 2009]
Truck traffic:6% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:51.5 tons [46.8 metric tons]
Inventory rating:30.7 tons [27.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:81.7

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:84,560 [as of 1999]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:51.5 tons [46.8 metric tons]
Inventory rating:30.7 tons [27.9 metric tons]
Sufficiency rating:85.7

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:99,770 [as of 1991]
Truck traffic:3% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:84.8
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$189,000