I-240WB 348578G over I240 WB / CSX RR (ABAND)

Map 

Coordinates:
+35.14944, -89.88194
35°08'58" N, 89°52'55" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-240WB 348578G over I240 WB / CSX RR (ABAND)
Structure number:79I02400120
Location:0.21 MI. S OF I-40 JCT.
Purpose:Carries highway over railroad
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:79.7 ft. [24.3 m]
Total length:79.7 ft. [24.3 m]
Roadway width between curbs:70.2 ft. [21.4 m]
Deck width edge-to-edge:73.8 ft. [22.5 m]
Vertical clearance below bridge:22.6 ft. [6.9 m]
Skew angle:42°
Owner:State Highway Agency [01]
Year built:2001
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Main span material:Prestressed concrete [5]
Main span design:Box Beam or girders - Single or Spread [06]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:163,320 [as of 2009]
Truck traffic:7% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:90.3

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:139,200 [as of 1999]
Truck traffic:7% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:54.5 tons [49.5 metric tons]
Inventory rating:32.7 tons [29.7 metric tons]
Sufficiency rating:80.3

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:94,510 [as of 1991]
Truck traffic:4% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:82.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$246,000