FAU 2810 over PLOUGH-RL/AIRPORT INCHNG
Map
Coordinates:
+35.06333, -89.9869435°03'48" N, 89°59'13" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | FAU 2810 over PLOUGH-RL/AIRPORT INCHNG |
| Structure number: | 79K28100005 |
| Location: | PLOUGH BLVD - MEMPHIS |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Other Freeways or Expressways (Urban) [12] |
| Length of largest span: | 98.1 ft. [29.9 m] |
| Total length: | 98.1 ft. [29.9 m] |
| Roadway width between curbs: | 54.1 ft. [16.5 m] |
| Deck width edge-to-edge: | 56.1 ft. [17.1 m] |
| Vertical clearance below bridge: | 15.7 ft. [4.8 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1970 |
| Historic significance: | Historical significance is not determinable at this time [4] |
| Design load: | MS 18 / HS 20 [5] |
| Main span material: | Prestressed concrete [5] |
| Main span design: | Box Beam or girders - Single or Spread [06] |
| Deck type: | Concrete Precast Panels [2] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 39,760 [as of 2007] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 96.0 tons [87.3 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 90.1 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 40,200 [as of 1999] |
| Truck traffic: | 6% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 96.0 tons [87.3 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 94.1 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 37,380 [as of 1991] |
| Truck traffic: | 3% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 93.1 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $398,000 |