FAU 2813 over DAYS CREEK

Map 

Coordinates:
+35.05333, -89.99806
35°03'12" N, 89°59'53" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:FAU 2813 over DAYS CREEK
Structure number:79S81000007
Location:WINCHESTER RD - MEMPHIS
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:50.9 ft. [15.5 m]
Total length:126.0 ft. [38.4 m]
Roadway width between curbs:71.9 ft. [21.9 m]
Deck width edge-to-edge:86.3 ft. [26.3 m]
Skew angle:20°
Owner:City or Municipal Highway Agency [04]
Year built:1965
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:21,590 [as of 2007]
Truck traffic:4% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:34.7 tons [31.5 metric tons]
Inventory rating:18.8 tons [17.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:43.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,649,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:24,590 [as of 1999]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:34.7 tons [31.5 metric tons]
Inventory rating:18.8 tons [17.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:44.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,435,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:24,670 [as of 1991]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:36.6 tons [33.3 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:55.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$683,000