FAP 1 over WOLF RIVER

Map 

Coordinates:
+35.15806, -89.88278
35°09'29" N, 89°52'58" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:FAP 1 over WOLF RIVER
Structure number:79SR0010015
Location:0.2 MI W OF I-40 JCT
Purpose:Carries highway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:71.5 ft. [21.8 m]
Total length:716.9 ft. [218.5 m]
Roadway width between curbs:64.0 ft. [19.5 m]
Deck width edge-to-edge:65.9 ft. [20.1 m]
Owner:State Highway Agency [01]
Year built:1926
Year reconstructed:1978
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Prestressed concrete continuous [6]
Main spans design:Box Beam or girders - Single or Spread [06]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:28,270 [as of 2009]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:49.5 tons [45.0 metric tons]
Inventory rating:29.7 tons [27.0 metric tons]
Sufficiency rating:79.9
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$7,319,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:39,240 [as of 1999]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Countermeasures have been installed to mitigate an existing problem with scour. [7]
Operating rating:39.6 tons [36.0 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Sufficiency rating:77.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,872,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:31,270 [as of 1991]
Truck traffic:1% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:36.6 tons [33.3 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:45.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$539,000