Facts 

Name:FAU 3 over RAVINE
Structure number:79SR0030009
Location:.1 M FM HERNANDO RD
Route classification:Minor Arterial (Urban) [16]
Length of largest span:28.5 ft. [8.7 m]
Total length:113.9 ft. [34.7 m]
Roadway width between curbs:55.8 ft. [17.0 m]
Deck width edge-to-edge:62.7 ft. [19.1 m]
Owner:State Highway Agency [01]
Year built:1934
Year reconstructed:1961
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 13.5 / H 15 [2]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: March 2015 

Status:Open, no restriction [A]
Average daily traffic:16,730 [as of 2014]
Truck traffic:3% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Structural appraisal:Equal to present minimum criteria [6]
Deck geometry appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge not over waterway. [N]
Operating rating:49.5 tons [45.0 metric tons]
Inventory rating:29.7 tons [27.0 metric tons]
Sufficiency rating:79.8
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,429,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
March 201579.8Not deficientSatisfactorySatisfactorySatisfactory16730
February 201379.5Not deficientSatisfactorySatisfactorySatisfactory17370
April 201180.1Not deficientSatisfactorySatisfactorySatisfactory16130
May 200978.3Not deficientSatisfactorySatisfactorySatisfactory20320
August 200765.7Not deficientSatisfactorySatisfactoryFair20480
August 200564.6Not deficientSatisfactorySatisfactoryFair22710
September 200364.0Not deficientSatisfactorySatisfactoryFair23950
October 200175.9Not deficientSatisfactorySatisfactorySatisfactory25990
February 200075.8Not deficientSatisfactorySatisfactorySatisfactory26070
February 199876.9Not deficientSatisfactorySatisfactorySatisfactory24370
September 199576.9Not deficientSatisfactorySatisfactorySatisfactory24390
August 199376.3Not deficientSatisfactorySatisfactorySatisfactory25950
December 199176.3Not deficientSatisfactorySatisfactorySatisfactory25860