FAP 3 over LOOSAHATCHIE RIVER (RL)
Map
Coordinates:
+35.25972, -89.9938935°15'35" N, 89°59'38" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | FAP 3 over LOOSAHATCHIE RIVER (RL) |
| Structure number: | 79SR0030037 |
| Location: | 2.0 MI N OF SR388 JCT |
| Purpose: | Carries highway over waterway |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 73.5 ft. [22.4 m] |
| Total length: | 329.4 ft. [100.4 m] |
| Roadway width between curbs: | 42.0 ft. [12.8 m] |
| Deck width edge-to-edge: | 44.0 ft. [13.4 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1993 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 6 |
| Main spans material: | Prestressed concrete continuous [6] |
| Main spans design: | Box Beam or girders - Single or Spread [06] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 20,590 [as of 2009] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 54.5 tons [49.5 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 97.0 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 25,540 [as of 1999] |
| Truck traffic: | 10% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 54.5 tons [49.5 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 96.8 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 26,250 [as of 1991] |
| Truck traffic: | 8% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 36.6 tons [33.3 metric tons] |
| Inventory rating: | 26.7 tons [24.3 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 54.9 |
| Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
| Estimated cost of work: | $483,000 |