Facts 

Name:NFA K800 over WOLF RIVER
Structure number:79SR0140029
Location:AUSTIN PEAY HWY.-MEMPHIS
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Local (Urban) [19]
Length of largest span:100.1 ft. [30.5 m]
Total length:814.7 ft. [248.3 m]
Roadway width between curbs:47.9 ft. [14.6 m]
Deck width edge-to-edge:60.4 ft. [18.4 m]
Owner:City or Municipal Highway Agency [04]
Year built:1939
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,570 [as of 2007]
Truck traffic:3% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:60.4 tons [54.9 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:36.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$13,576,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,880 [as of 1997]
Truck traffic:3% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:39.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$5,335,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:45,700 [as of 1991]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Serious [3 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Countermeasures have been installed to mitigate an existing problem with scour. [7]
Operating rating:73.3 tons [66.6 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:21.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,900,000