FAS 385 over CNIC RR

Map 

Coordinates:
+35.32750, -89.90278
35°19'39" N, 89°54'10" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:FAS 385 over CNIC RR
Structure number:79SR3850002
Location:0.99 MI. E OF SR-3 JCT.
Purpose:Carries highway over railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:80.1 ft. [24.4 m]
Total length:207.0 ft. [63.1 m]
Roadway width between curbs:45.9 ft. [14.0 m]
Deck width edge-to-edge:61.0 ft. [18.6 m]
Vertical clearance below bridge:23.3 ft. [7.1 m]
Skew angle:30°
Owner:State Highway Agency [01]
Year built:1981
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Prestressed concrete continuous [6]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Precast Panels [2]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:17,980 [as of 2009]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:68.3 tons [62.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:97.2

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,460 [as of 1999]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:98.0 tons [89.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:97.1

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,040 [as of 1991]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:94.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$890,000