Share:

I81 over NFA A140

Map 

Coordinates:
+36.53833, -82.34833
36°32'18" N, 82°20'54" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I81 over NFA A140
Structure number:82I00810032
Location:.8 M SW JCT I81&SR37
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:48.9 ft. [14.9 m]
Total length:126.0 ft. [38.4 m]
Roadway width between curbs:42.0 ft. [12.8 m]
Deck width edge-to-edge:44.0 ft. [13.4 m]
Vertical clearance below bridge:14.8 ft. [4.5 m]
Skew angle:
Owner:State Highway Agency [01]
Year built:1973
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Prestressed concrete continuous [6]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:25,890 [as of 2009]
Truck traffic:35% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:53.5 tons [48.6 metric tons]
Inventory rating:31.7 tons [28.8 metric tons]
Sufficiency rating:93.3

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:26,490 [as of 1998]
Truck traffic:35% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:53.5 tons [48.6 metric tons]
Inventory rating:31.7 tons [28.8 metric tons]
Sufficiency rating:92.2

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:20,070 [as of 1991]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:94.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$398,000