Facts 

Name:US 84 over SABINE RIVER
Structure number:112100017501022
Location:AT SABINE RIVER
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other (Rural) [02]
Length of largest span:125.0 ft. [38.1 m]
Total length:873.1 ft. [266.1 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:32.2 ft. [9.8 m]
Owner:State Highway Agency [01]
Year built:1936
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,800 [as of 2008]
Truck traffic:18% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:19.9 tons [18.1 metric tons]
Inventory rating:18.7 tons [17.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:19.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,759,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,800 [as of 1998]
Truck traffic:15% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:19.8 tons [18.0 metric tons]
Inventory rating:18.6 tons [16.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:19.1
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,759,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,800 [as of 1990]
Truck traffic:14% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:24.8 tons [22.5 metric tons]
Inventory rating:18.6 tons [16.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:26.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,759,000