Share:

E VIRGINIA ST over SPUR 380

Map 

Coordinates:
+30.04181, -94.07021
30°02'31" N, 94°04'13" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:E VIRGINIA ST over SPUR 380
Structure number:201240006508099
Location:0.7 MI NW OF US 96
Purpose:Carries highway over highway
Route classification:Local (Urban) [19]
Length of largest span:61.0 ft. [18.6 m]
Total length:122.1 ft. [37.2 m]
Roadway width between curbs:49.9 ft. [15.2 m]
Deck width edge-to-edge:64.0 ft. [19.5 m]
Vertical clearance below bridge:15.4 ft. [4.7 m]
Skew angle:24°
Owner:State Highway Agency [01]
Year built:1968
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 18 / H 20 [4]
Number of main spans:2
Main spans material:Prestressed concrete continuous [6]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:4,380 [as of 2006]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.8 tons [44.4 metric tons]
Inventory rating:32.9 tons [29.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:79.2
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$15,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:200 [as of 1990]
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:32.7 tons [29.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:88.5
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$153,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:200 [as of 1988]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:33.4 tons [30.4 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:86.0