Share:

LAWHON RD. over GALLIER CANAL

Map 

Coordinates:
+30.00095, -94.24842
30°00'03" N, 94°14'54" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:LAWHON RD. over GALLIER CANAL
Structure number:201240AA0222001
Location:2.80 MI E OF CR 192
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:20.0 ft. [6.1 m]
Total length:40.0 ft. [12.2 m]
Roadway width between curbs:21.3 ft. [6.5 m]
Deck width edge-to-edge:23.3 ft. [7.1 m]
Owner:County Highway Agency [02]
Year built:1960
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 13.5 / H 15 [2]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,008 [as of 2006]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:36.0 tons [32.7 metric tons]
Inventory rating:27.0 tons [24.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:69.9
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$3,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,075 [as of 1990]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:25.7 tons [23.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:69.2
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$21,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,075 [as of 1990]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:24.8 tons [22.5 metric tons]
Inventory rating:18.6 tons [16.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:62.5
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$21,000