CR 336 (ERIE RD.) over LNVA CANAL

Map 

Coordinates:
+30.02745, -94.10079
30°01'39" N, 94°06'03" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:CR 336 (ERIE RD.) over LNVA CANAL
Structure number:201240AA0336002
Location:0.5 MI S OF US 69
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:15.1 ft. [4.6 m]
Total length:60.0 ft. [18.3 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:27.9 ft. [8.5 m]
Owner:County Highway Agency [02]
Year built:1983
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Other [00]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:370 [as of 2006]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:36.0 tons [32.7 metric tons]
Inventory rating:27.0 tons [24.5 metric tons]
Sufficiency rating:63.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$71,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:60 [as of 1990]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:47.5 tons [43.2 metric tons]
Inventory rating:34.7 tons [31.5 metric tons]
Sufficiency rating:91.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$71,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:60 [as of 1987]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:33.4 tons [30.4 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Sufficiency rating:88.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$71,000