CO. RD. AT HATTON over I-15 (SR-15) NBL & SBL

Map 

Coordinates:
+38.83667, -112.47750
38°50'12" N, 112°28'39" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:CO. RD. AT HATTON over I-15 (SR-15) NBL & SBL
Structure number:0C 366
Location:5.3 MI.SO.MEADOW INTERCHG
Purpose:Carries highway over highway
Route classification:Local (Rural) [09]
Length of largest span:120.1 ft. [36.6 m]
Total length:318.9 ft. [97.2 m]
Roadway width between curbs:30.5 ft. [9.3 m]
Deck width edge-to-edge:34.5 ft. [10.5 m]
Vertical clearance below bridge:16.7 ft. [5.1 m]
Skew angle:37°
Owner:State Highway Agency [01]
Year built:1973
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:63 [as of 2010]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:97.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,191,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:50 [as of 1998]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:92.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,191,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:50 [as of 1989]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:99.0