I-15 (SR-15) NBL over SR-140,BLUFFDALE ROAD

Map 

Coordinates:
+40.48361, -111.89889
40°29'01" N, 111°53'56" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-15 (SR-15) NBL over SR-140,BLUFFDALE ROAD
Structure number:1F 207
Location:BLUFFDALE RD.INTERCHANGE
Purpose:Carries highway overpass over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:59.1 ft. [18.0 m]
Total length:164.1 ft. [50.0 m]
Roadway width between curbs:78.1 ft. [23.8 m]
Deck width edge-to-edge:81.0 ft. [24.7 m]
Vertical clearance below bridge:17.1 ft. [5.2 m]
Skew angle:10°
Owner:State Highway Agency [01]
Year built:1971
Year reconstructed:2004
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:64,245 [as of 2010]
Truck traffic:11% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:94.0

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:41,096 [as of 1998]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,139,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:25,285 [as of 1989]
Truck traffic:14% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:95.0