I-15 (SR-15) NBL over SR-140,BLUFFDALE ROAD
Map
Coordinates:
+40.48361, -111.8988940°29'01" N, 111°53'56" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I-15 (SR-15) NBL over SR-140,BLUFFDALE ROAD |
| Structure number: | 1F 207 |
| Location: | BLUFFDALE RD.INTERCHANGE |
| Purpose: | Carries highway overpass over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 59.1 ft. [18.0 m] |
| Total length: | 164.1 ft. [50.0 m] |
| Roadway width between curbs: | 78.1 ft. [23.8 m] |
| Deck width edge-to-edge: | 81.0 ft. [24.7 m] |
| Vertical clearance below bridge: | 17.1 ft. [5.2 m] |
| Skew angle: | 10° |
| Owner: | State Highway Agency [01] |
| Year built: | 1971 |
| Year reconstructed: | 2004 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Prestressed concrete [5] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 64,245 [as of 2010] |
| Truck traffic: | 11% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 35.6 tons [32.4 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 94.0 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 41,096 [as of 1998] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 35.6 tons [32.4 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 76.0 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $1,139,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 25,285 [as of 1989] |
| Truck traffic: | 14% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 35.6 tons [32.4 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 95.0 |