I-15 (SR-15) SBL over US-6 (SR-6), INT. X-ROAD

Map 

Coordinates:
+39.97556, -111.77250
39°58'32" N, 111°46'21" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-15 (SR-15) SBL over US-6 (SR-6), INT. X-ROAD
Structure number:3F 128
Location:SANTAQUIN INTERCHANGE
Purpose:Carries highway overpass over highway
Route classification:Principal Arterial - Interstate (Rural) [01]
Length of largest span:59.1 ft. [18.0 m]
Total length:137.1 ft. [41.8 m]
Roadway width between curbs:36.4 ft. [11.1 m]
Deck width edge-to-edge:40.0 ft. [12.2 m]
Vertical clearance below bridge:15.7 ft. [4.8 m]
Skew angle:38°
Owner:State Highway Agency [01]
Year built:1967
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,850 [as of 2010]
Truck traffic:30% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:92.0

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,215 [as of 1998]
Truck traffic:16% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:90.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$774,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,215 [as of 1989]
Truck traffic:19% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:79.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$776,000