Share:

I-15 (SR-15) SBL over SR-133, INTCHG. X-ROAD

Map 

Coordinates:
+38.89389, -112.41139
38°53'38" N, 112°24'41" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-15 (SR-15) SBL over SR-133, INTCHG. X-ROAD
Structure number:3F 259
Location:MEADOW INTERCHANGE
Purpose:Carries highway overpass over highway
Route classification:Principal Arterial - Interstate (Rural) [01]
Length of largest span:86.0 ft. [26.2 m]
Total length:183.1 ft. [55.8 m]
Roadway width between curbs:40.4 ft. [12.3 m]
Deck width edge-to-edge:44.3 ft. [13.5 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Skew angle:34°
Owner:State Highway Agency [01]
Year built:1972
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,460 [as of 2010]
Truck traffic:31% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:98.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$993,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,835 [as of 1998]
Truck traffic:23% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:93.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$993,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,880 [as of 1989]
Truck traffic:32% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:97.0