C2002 over OTTAUQUECHEE RIVER

Map 

Coordinates:
+43.63100, -72.46761
43°37'52" N, 72°28'03" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:C2002 over OTTAUQUECHEE RIVER
Structure number:101424004514241
Location:0.03 MI TO JCT W US 4
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:92.9 ft. [28.3 m]
Total length:198.2 ft. [60.4 m]
Roadway width between curbs:14.8 ft. [4.5 m]
Deck width edge-to-edge:14.8 ft. [4.5 m]
Vertical clearance above deck:7.9 ft. [2.4 m]
Owner:Town or Township Highway Agency [03]
Year built:1836
Year reconstructed:1952
Historic significance:Bridge is on the National Register of Historic Places [1]
Number of main spans:2
Main spans material:Wood or timber [7]
Main spans design:Arch - Thru [12]
Deck type:Wood or Timber [8]
Wearing surface:Wood or Timber [7]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,500 [as of 2008]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:7.9 tons [7.2 metric tons]
Inventory rating:7.9 tons [7.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:8.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,029,000

2000 Inspection 

Status:Posted for other load-capacity restriction [R]
Average daily traffic:1,500 [as of 1996]
Truck traffic:2% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:7.9 tons [7.2 metric tons]
Inventory rating:7.9 tons [7.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:8.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$771,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:1,200 [as of 1988]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:7.9 tons [7.2 metric tons]
Inventory rating:7.9 tons [7.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:10.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,306,000