Share:

I-5 over STILLAGUAMISH R

Map 

Coordinates:
+48.19694, -122.21025
48°11'49" N, 122°12'37" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-5 over STILLAGUAMISH R
Structure number:0001652A0000000
Location:0.7 N JCT SR 530
Purpose:Carries highway over highway and waterway
Route classification:Principal Arterial - Interstate (Rural) [01]
Length of largest span:200.1 ft. [61.0 m]
Total length:859.0 ft. [261.8 m]
Roadway width between curbs:47.9 ft. [14.6 m]
Deck width edge-to-edge:49.2 ft. [15.0 m]
Vertical clearance above deck:16.4 ft. [5.0 m]
Vertical clearance below bridge:11.5 ft. [3.5 m]
Owner:State Highway Agency [01]
Year built:1933
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:39,247 [as of 2007]
Truck traffic:11% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:34.7 tons [31.5 metric tons]
Inventory rating:20.8 tons [18.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:48.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$663,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:27,261 [as of 1994]
Truck traffic:13% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:34.7 tons [31.5 metric tons]
Inventory rating:20.8 tons [18.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:47.0
Recommended work:Replacement of bridge or other structure because of relocation of road. [32]
Estimated cost of work:$770,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:16,675 [as of 1984]
Truck traffic:15% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:18.8 tons [17.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:49.8
Recommended work:Replacement of bridge or other structure because of relocation of road. [32]
Estimated cost of work:$5,223,000