SR 25 over SPOKANE R
Map
Coordinates:
+47.90830, -118.3153447°54'30" N, 118°18'55" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | SR 25 over SPOKANE R |
| Structure number: | 0002658A0000000 |
| Location: | 23.4 N JCT US 2 |
| Purpose: | Carries highway and pedestrian walkway over waterway |
| Route classification: | Minor Arterial (Rural) [06] |
| Length of largest span: | 432.1 ft. [131.7 m] |
| Total length: | 958.1 ft. [292.0 m] |
| Roadway width between curbs: | 24.0 ft. [7.3 m] |
| Deck width edge-to-edge: | 26.2 ft. [8.0 m] |
| Vertical clearance above deck: | 14.4 ft. [4.4 m] |
| Vertical clearance below bridge: | 35.1 ft. [10.7 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1941 |
| Historic significance: | Bridge is on the National Register of Historic Places [1] |
| Design load: | M 13.5 / H 15 [2] |
| Number of main spans: | 3 |
| Main spans material: | Steel [3] |
| Main spans design: | Truss - Thru [10] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,173 [as of 2007] |
| Truck traffic: | 12% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. [4] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 35.6 tons [32.4 metric tons] |
| Inventory rating: | 21.8 tons [19.8 metric tons] |
| Sufficiency rating: | 42.5 |
| Estimated cost of work: | $560,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 507 [as of 1994] |
| Truck traffic: | 12% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 35.6 tons [32.4 metric tons] |
| Inventory rating: | 21.8 tons [19.8 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 40.4 |
| Estimated cost of work: | $626,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 405 [as of 1984] |
| Truck traffic: | 15% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Pier/abutment protection: | Navigation protection not required [1] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required. [4] |
| Operating rating: | 35.6 tons [32.4 metric tons] |
| Inventory rating: | 18.8 tons [17.1 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 42.1 |
| Estimated cost of work: | $3,314,000 |