SR 99 RAMP over 1ST AVE
Map
Coordinates:
+47.59622, -122.3342347°35'46" N, 122°20'03" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | SR 99 RAMP over 1ST AVE |
| Structure number: | 0004104A0000000 |
| Location: | 4.1 N JCT 509 |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Other Freeways or Expressways (Urban) [12] |
| Length of largest span: | 55.1 ft. [16.8 m] |
| Total length: | 664.1 ft. [202.4 m] |
| Roadway width between curbs: | 24.9 ft. [7.6 m] |
| Deck width edge-to-edge: | 27.6 ft. [8.4 m] |
| Vertical clearance below bridge: | 14.1 ft. [4.3 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1953 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 12 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Posted for load [P] |
| Average daily traffic: | 10,873 [as of 2007] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 51.5 tons [46.8 metric tons] |
| Inventory rating: | 19.8 tons [18.0 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 71.1 |
| Estimated cost of work: | $198,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 9,122 [as of 1994] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 51.5 tons [46.8 metric tons] |
| Inventory rating: | 19.8 tons [18.0 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 71.4 |
| Estimated cost of work: | $245,000 |