I-5 over EXP N-42ND RAMP
Map
Coordinates:
+47.65630, -122.3222747°39'23" N, 122°19'20" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I-5 over EXP N-42ND RAMP |
| Structure number: | 0006085A0000000 |
| Location: | 4.6 N JCT I-90 |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 104.0 ft. [31.7 m] |
| Total length: | 273.0 ft. [83.2 m] |
| Roadway width between curbs: | 22.0 ft. [6.7 m] |
| Deck width edge-to-edge: | 26.9 ft. [8.2 m] |
| Vertical clearance below bridge: | 14.4 ft. [4.4 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1962 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 4 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Box Beam or girders - Single or Spread [06] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Latex Concrete or similar additive [3] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,425 [as of 2007] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 49.5 tons [45.0 metric tons] |
| Inventory rating: | 29.7 tons [27.0 metric tons] |
| Sufficiency rating: | 94.6 |
| Estimated cost of work: | $93,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 33,081 [as of 1994] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 31.7 tons [28.8 metric tons] |
| Inventory rating: | 18.8 tons [17.1 metric tons] |
| Sufficiency rating: | 73.3 |
| Estimated cost of work: | $114,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 4,510 [as of 1976] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 54.5 tons [49.5 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 67.5 |
| Estimated cost of work: | $419,000 |