Share:

I-5 over S-STEWART RAMP BR

Map 

Coordinates:
+47.62241, -122.32867
47°37'21" N, 122°19'43" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-5 over S-STEWART RAMP BR
Structure number:0006653A0000000
Location:2.1 N JCT I-90
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:83.0 ft. [25.3 m]
Total length:212.9 ft. [64.9 m]
Roadway width between curbs:21.0 ft. [6.4 m]
Deck width edge-to-edge:25.6 ft. [7.8 m]
Owner:State Highway Agency [01]
Year built:1962
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,794 [as of 2007]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:82.2 tons [74.7 metric tons]
Inventory rating:48.5 tons [44.1 metric tons]
Sufficiency rating:96.2
Estimated cost of work:$93,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,805 [as of 1994]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:82.2 tons [74.7 metric tons]
Inventory rating:48.5 tons [44.1 metric tons]
Sufficiency rating:92.7
Estimated cost of work:$95,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,240 [as of 1976]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:54.5 tons [49.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:93.0
Estimated cost of work:$330,000