I-5 over EXP S-W RAMP BR
Map
Coordinates:
+47.62833, -122.3266747°37'42" N, 122°19'36" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I-5 over EXP S-W RAMP BR |
| Structure number: | 0006800H0000000 |
| Location: | 2.1 N JCT I-90 |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 38.1 ft. [11.6 m] |
| Total length: | 743.1 ft. [226.5 m] |
| Roadway width between curbs: | 21.0 ft. [6.4 m] |
| Deck width edge-to-edge: | 25.6 ft. [7.8 m] |
| Vertical clearance above deck: | 16.4 ft. [5.0 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1964 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 21 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Slab [01] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 4,459 [as of 2007] |
| Truck traffic: | 1% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 82.2 tons [74.7 metric tons] |
| Inventory rating: | 48.5 tons [44.1 metric tons] |
| Sufficiency rating: | 89.5 |
| Estimated cost of work: | $270,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 33,081 [as of 1994] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 82.2 tons [74.7 metric tons] |
| Inventory rating: | 48.5 tons [44.1 metric tons] |
| Sufficiency rating: | 87.7 |
| Estimated cost of work: | $270,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 10,060 [as of 1976] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 54.5 tons [49.5 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 90.2 |
| Estimated cost of work: | $1,116,000 |