Share:

SR 520 RAMP over PORTAGE BAY

Map 

Coordinates:
+47.64324, -122.30959
47°38'36" N, 122°18'35" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SR 520 RAMP over PORTAGE BAY
Structure number:0006819B0000000
Location:0.8 E JCT I-5
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:75.1 ft. [22.9 m]
Total length:375.0 ft. [114.3 m]
Roadway width between curbs:18.0 ft. [5.5 m]
Deck width edge-to-edge:22.6 ft. [6.9 m]
Owner:State Highway Agency [01]
Year built:1963
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:5
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,864 [as of 2007]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:56.4 tons [51.3 metric tons]
Inventory rating:32.7 tons [29.7 metric tons]
Sufficiency rating:93.5
Estimated cost of work:$149,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,866 [as of 1994]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:56.4 tons [51.3 metric tons]
Inventory rating:32.7 tons [29.7 metric tons]
Sufficiency rating:92.4
Estimated cost of work:$149,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,800 [as of 1986]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:54.5 tons [49.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:94.2
Estimated cost of work:$988,000