Share:

WB SR520 OFF RAMP over ARBORETUM & N-MONT

Map 

Coordinates:
+47.64427, -122.30439
47°38'39" N, 122°18'16" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:WB SR520 OFF RAMP over ARBORETUM & N-MONT
Structure number:0006872D0000000
Location:0.4 E JCT SR 513
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:100.1 ft. [30.5 m]
Total length:366.2 ft. [111.6 m]
Roadway width between curbs:58.1 ft. [17.7 m]
Deck width edge-to-edge:63.0 ft. [19.2 m]
Vertical clearance below bridge:15.4 ft. [4.7 m]
Skew angle:47°
Owner:State Highway Agency [01]
Year built:1963
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:4
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:4,805 [as of 2007]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:59.4 tons [54.0 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:95.5
Estimated cost of work:$119,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:4,963 [as of 1994]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:47.5 tons [43.2 metric tons]
Inventory rating:27.7 tons [25.2 metric tons]
Sufficiency rating:89.2
Estimated cost of work:$152,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,190 [as of 1976]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:54.5 tons [49.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:81.8
Estimated cost of work:$924,000