Share:

I-5 over NBCD VIADUCT STA 2195

Map 

Coordinates:
+47.60500, -122.32667
47°36'18" N, 122°19'36" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-5 over NBCD VIADUCT STA 2195
Structure number:0007110F0000000
Location:0.8 N JCT I-90
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:80.1 ft. [24.4 m]
Total length:702.1 ft. [214.0 m]
Roadway width between curbs:32.2 ft. [9.8 m]
Deck width edge-to-edge:36.7 ft. [11.2 m]
Vertical clearance below bridge:15.7 ft. [4.8 m]
Owner:State Highway Agency [01]
Year built:1964
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:10
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:28,233 [as of 2007]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:36.6 tons [33.3 metric tons]
Inventory rating:21.8 tons [19.8 metric tons]
Sufficiency rating:79.6
Estimated cost of work:$279,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:44,900 [as of 1994]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:36.6 tons [33.3 metric tons]
Inventory rating:21.8 tons [19.8 metric tons]
Sufficiency rating:73.6
Estimated cost of work:$342,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,980 [as of 1976]
Truck traffic:15% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:54.5 tons [49.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:93.5
Estimated cost of work:$1,403,000