Share:

I-5 over SPRING-S RAMP S-COL

Map 

Coordinates:
+47.60833, -122.33000
47°36'30" N, 122°19'48" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-5 over SPRING-S RAMP S-COL
Structure number:0007110J0000000
Location:1.1 N JCT I-90
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:70.9 ft. [21.6 m]
Total length:176.8 ft. [53.9 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:28.5 ft. [8.7 m]
Vertical clearance below bridge:18.0 ft. [5.5 m]
Owner:State Highway Agency [01]
Year built:1964
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:15,895 [as of 2007]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:63.4 tons [57.6 metric tons]
Inventory rating:38.6 tons [35.1 metric tons]
Sufficiency rating:89.6
Estimated cost of work:$66,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,678 [as of 1994]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:63.4 tons [57.6 metric tons]
Inventory rating:38.6 tons [35.1 metric tons]
Sufficiency rating:90.4
Estimated cost of work:$81,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,860 [as of 1976]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:54.5 tons [49.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:90.6
Estimated cost of work:$275,000