Share:

I-5 over EXP JAMES-CHERRY ST

Map 

Coordinates:
+47.60436, -122.32759
47°36'16" N, 122°19'39" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-5 over EXP JAMES-CHERRY ST
Structure number:0007110K0000000
Location:0.8 N JCT I-90
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:80.1 ft. [24.4 m]
Total length:671.9 ft. [204.8 m]
Roadway width between curbs:21.0 ft. [6.4 m]
Deck width edge-to-edge:24.0 ft. [7.3 m]
Vertical clearance below bridge:11.5 ft. [3.5 m]
Owner:State Highway Agency [01]
Year built:1964
Year reconstructed:1991
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:9
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:23,275 [as of 2007]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:41.6 tons [37.8 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.0
Estimated cost of work:$200,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:20,766 [as of 1994]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:41.6 tons [37.8 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Sufficiency rating:71.1
Estimated cost of work:$248,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:16,330 [as of 1976]
Truck traffic:5% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:54.5 tons [49.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:54.6
Estimated cost of work:$1,010,000