Share:

SR 523 / NE 145TH over I-5

Map 

Coordinates:
+47.73405, -122.32472
47°44'03" N, 122°19'29" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SR 523 / NE 145TH over I-5
Structure number:0007270E0000000
Location:1.0 N JCT SR 99
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:75.1 ft. [22.9 m]
Total length:249.0 ft. [75.9 m]
Roadway width between curbs:58.1 ft. [17.7 m]
Deck width edge-to-edge:71.9 ft. [21.9 m]
Vertical clearance below bridge:16.7 ft. [5.1 m]
Skew angle:15°
Owner:State Highway Agency [01]
Year built:1964
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:28,018 [as of 2007]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:98.0 tons [89.1 metric tons]
Inventory rating:88.1 tons [80.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:68.6
Estimated cost of work:$985,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:44,175 [as of 1994]
Truck traffic:2% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:88.1 tons [80.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:65.5
Estimated cost of work:$985,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:17,150 [as of 1984]
Truck traffic:15% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:54.5 tons [49.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:73.6
Estimated cost of work:$985,000