SR 523 / NE 145TH over I-5
Map
Coordinates:
+47.73405, -122.3247247°44'03" N, 122°19'29" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | SR 523 / NE 145TH over I-5 |
| Structure number: | 0007270E0000000 |
| Location: | 1.0 N JCT SR 99 |
| Purpose: | Carries highway and pedestrian walkway over highway |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 75.1 ft. [22.9 m] |
| Total length: | 249.0 ft. [75.9 m] |
| Roadway width between curbs: | 58.1 ft. [17.7 m] |
| Deck width edge-to-edge: | 71.9 ft. [21.9 m] |
| Vertical clearance below bridge: | 16.7 ft. [5.1 m] |
| Skew angle: | 15° |
| Owner: | State Highway Agency [01] |
| Year built: | 1964 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 4 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Box beam or girders - Multiple [05] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Latex Concrete or similar additive [3] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 28,018 [as of 2007] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 98.0 tons [89.1 metric tons] |
| Inventory rating: | 88.1 tons [80.1 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 68.6 |
| Estimated cost of work: | $985,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 44,175 [as of 1994] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Inventory rating: | 88.1 tons [80.1 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 65.5 |
| Estimated cost of work: | $985,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 17,150 [as of 1984] |
| Truck traffic: | 15% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 54.5 tons [49.5 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 73.6 |
| Estimated cost of work: | $985,000 |