Share:

FERRY TRAFFIC over ELLIOTT BAY

Map 

Coordinates:
+47.60349, -122.33922
47°36'13" N, 122°20'21" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:FERRY TRAFFIC over ELLIOTT BAY
Structure number:0007486A0000000
Location:W END MARION ST
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Tolls:Yes [1]
Length of largest span:80.1 ft. [24.4 m]
Total length:105.0 ft. [32.0 m]
Roadway width between curbs:20.0 ft. [6.1 m]
Deck width edge-to-edge:24.0 ft. [7.3 m]
Vertical clearance above deck:16.1 ft. [4.9 m]
Owner:State Highway Agency [01]
Year built:1964
Year reconstructed:1993
Historic significance:Historical significance is not determinable at this time [4]
Design load:M 13.5 / H 15 [2]
Main span material:Steel [3]
Main span design:Movable - Lift [15]
Deck type:Closed Grating [4]
Wearing surface:Epoxy Overlay [5]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:100 [as of 2006]
Truck traffic:2% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:In place but in a deteriorated condition [3]
Scour condition:Bridge is scour critical; bridge foundations determined to be unstable. [3]
Operating rating:38.6 tons [35.1 metric tons]
Inventory rating:28.7 tons [26.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:80.9
Estimated cost of work:$141,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,710 [as of 1994]
Truck traffic:2% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge over "tidal" waters that has not been evaluated for scour, but considered low risk. [T]
Operating rating:18.8 tons [17.1 metric tons]
Inventory rating:18.8 tons [17.1 metric tons]
Sufficiency rating:19.5
Estimated cost of work:$708,000