Share:

SPOKANE ST EB LANE over I-5

Map 

Coordinates:
+47.57167, -122.31833
47°34'18" N, 122°19'06" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SPOKANE ST EB LANE over I-5
Structure number:0007741T0000000
Location:5.5 N JCT SR 900
Purpose:Carries highway and pedestrian walkway over highway and railroad
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:116.1 ft. [35.4 m]
Total length:1793.1 ft. [546.5 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:32.5 ft. [9.9 m]
Vertical clearance above deck:17.1 ft. [5.2 m]
Vertical clearance below bridge:18.7 ft. [5.7 m]
Owner:State Highway Agency [01]
Year built:1966
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:20
Main spans material:Concrete continuous [2]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:31,271 [as of 2007]
Truck traffic:5% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:63.4 tons [57.6 metric tons]
Inventory rating:37.6 tons [34.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:34.0
Estimated cost of work:$822,000

2000 Inspection 

Average daily traffic:158,692 [as of 1994]
Evaluation:Not applicable [N]

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:4,000 [as of 1976]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:54.5 tons [49.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:81.5
Recommended work:Replacement of bridge or other structure because of relocation of road. [32]
Estimated cost of work:$3,561,000