SR 167 over JAMES ST

Map 

Coordinates:
+47.38674, -122.24384
47°23'12" N, 122°14'38" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SR 167 over JAMES ST
Structure number:0008114G0000000
Location:0.6 N JCT SR 516
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Length of largest span:78.1 ft. [23.8 m]
Total length:191.0 ft. [58.2 m]
Roadway width between curbs:54.1 ft. [16.5 m]
Deck width edge-to-edge:55.8 ft. [17.0 m]
Vertical clearance below bridge:17.1 ft. [5.2 m]
Skew angle:99°
Owner:State Highway Agency [01]
Year built:1967
Year reconstructed:1998
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:53,666 [as of 2007]
Truck traffic:12% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:71.3 tons [64.8 metric tons]
Inventory rating:42.6 tons [38.7 metric tons]
Sufficiency rating:95.0
Estimated cost of work:$128,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:37,000 [as of 1996]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:71.3 tons [64.8 metric tons]
Inventory rating:42.6 tons [38.7 metric tons]
Sufficiency rating:94.5
Estimated cost of work:$158,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:26,050 [as of 1984]
Truck traffic:5% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:54.5 tons [49.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:93.0
Estimated cost of work:$391,000