Share:

I-90 over RAINIER AVE

Map 

Coordinates:
+47.58996, -122.30703
47°35'24" N, 122°18'25" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-90 over RAINIER AVE
Structure number:0013190A0000000
Location:0.6 E JCT I-5
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:121.1 ft. [36.9 m]
Total length:307.1 ft. [93.6 m]
Roadway width between curbs:80.1 ft. [24.4 m]
Deck width edge-to-edge:83.0 ft. [25.3 m]
Vertical clearance below bridge:18.0 ft. [5.5 m]
Skew angle:30°
Owner:State Highway Agency [01]
Year built:1988
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Prestressed concrete continuous [6]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:61,047 [as of 2007]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:98.0 tons [89.1 metric tons]
Inventory rating:86.1 tons [78.3 metric tons]
Sufficiency rating:90.1
Estimated cost of work:$392,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:48,088 [as of 1994]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:86.1 tons [78.3 metric tons]
Sufficiency rating:91.4
Estimated cost of work:$455,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1 [as of 1989]
Truck traffic:5% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:54.5 tons [49.5 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:92.0
Estimated cost of work:$1,938,000