Share:

I-90 HOV TRAFFIC over SEATTLE CITY STREETS

Map 

Coordinates:
+47.59275, -122.32423
47°35'34" N, 122°19'27" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-90 HOV TRAFFIC over SEATTLE CITY STREETS
Structure number:0013502B0000000
Location:0.2 W JCT I-5
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:154.9 ft. [47.2 m]
Total length:1436.1 ft. [437.7 m]
Roadway width between curbs:40.4 ft. [12.3 m]
Deck width edge-to-edge:43.3 ft. [13.2 m]
Vertical clearance below bridge:17.1 ft. [5.2 m]
Owner:State Highway Agency [01]
Year built:1991
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:11
Main spans material:Prestressed concrete continuous [6]
Main spans design:Box Beam or girders - Single or Spread [06]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Latex Concrete or similar additive [3]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,105 [as of 2007]
Truck traffic:28% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:44.6 tons [40.5 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:69.5
Estimated cost of work:$1,187,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:31,920 [as of 1994]
Truck traffic:5% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:44.6 tons [40.5 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Sufficiency rating:67.5
Estimated cost of work:$1,521,000