AIRPORT WAY S over RAILROAD STATION
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | AIRPORT WAY S over RAILROAD STATION |
| Structure number: | 085041000000000 |
| Location: | Airport Way S b/w 4th&5th |
| Purpose: | Carries highway and pedestrian walkway over railroad |
| Route classification: | Minor Arterial (Urban) [16] |
| Length of largest span: | 75.1 ft. [22.9 m] |
| Total length: | 287.1 ft. [87.5 m] |
| Roadway width between curbs: | 67.9 ft. [20.7 m] |
| Deck width edge-to-edge: | 101.1 ft. [30.8 m] |
| Vertical clearance below bridge: | 19.0 ft. [5.8 m] |
| Skew angle: | 37° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1910 |
| Year reconstructed: | 1981 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 22.5 / HS 25 [9] |
| Number of main spans: | 3 |
| Main spans material: | Steel [3] |
| Main spans design: | Girder and floorbeam system [03] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 25,835 [as of 2009] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 31.7 tons [28.8 metric tons] |
| Inventory rating: | 18.8 tons [17.1 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 50.5 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $1,898,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 20,000 [as of 1996] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 56.4 tons [51.3 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 78.6 |
| Estimated cost of work: | $1,699,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 18,900 [as of 1988] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 56.4 tons [51.3 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 79.2 |
| Estimated cost of work: | $1,699,000 |