Share:

PHINNEY AVE over N 57TH ST

Map 

Coordinates:
+47.67049, -122.35441
47°40'14" N, 122°21'16" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:PHINNEY AVE over N 57TH ST
Structure number:085085000000000
Location:5700 Phinney Ave N
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:60.0 ft. [18.3 m]
Total length:60.0 ft. [18.3 m]
Roadway width between curbs:54.1 ft. [16.5 m]
Deck width edge-to-edge:86.0 ft. [26.2 m]
Vertical clearance below bridge:13.1 ft. [4.0 m]
Owner:City or Municipal Highway Agency [04]
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 13.5 / HS 15 [3]
Main span material:Concrete [1]
Main span design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,800 [as of 2005]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:20.8 tons [18.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:57.9
Estimated cost of work:$256,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,600 [as of 1989]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:20.8 tons [18.9 metric tons]
Sufficiency rating:62.9
Estimated cost of work:$256,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,600 [as of 1989]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Sufficiency rating:82.0
Estimated cost of work:$256,000