Share:

SW ADMIRAL WAY over RAVINE, FAIRMOUNT AVE

Map 

Coordinates:
+47.58116, -122.38247
47°34'52" N, 122°22'57" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SW ADMIRAL WAY over RAVINE, FAIRMOUNT AVE
Structure number:085167000000000
Location:Fairmount Ave SW
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:80.1 ft. [24.4 m]
Total length:290.0 ft. [88.4 m]
Roadway width between curbs:25.9 ft. [7.9 m]
Deck width edge-to-edge:32.2 ft. [9.8 m]
Vertical clearance below bridge:80.4 ft. [24.5 m]
Owner:City or Municipal Highway Agency [04]
Year built:1927
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 22.5 / HS 25 [9]
Main span material:Concrete [1]
Main span design:Truss - Deck [09]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:30,519 [as of 2010]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:24.8 tons [22.5 metric tons]
Inventory rating:14.9 tons [13.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:48.3
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$9,280,000

2000 Inspection 

Status:Open, posting recommended but not legally implemented [B]
Average daily traffic:11,800 [as of 1992]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:24.8 tons [22.5 metric tons]
Inventory rating:14.9 tons [13.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:48.3
Estimated cost of work:$621,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,900 [as of 1988]
Truck traffic:5% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:27.7 tons [25.2 metric tons]
Inventory rating:19.8 tons [18.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:59.2
Estimated cost of work:$621,000