S LUCILE ST over RR TRACKS

Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:S LUCILE ST over RR TRACKS
Structure number:085352000000000
Location:S Lucile St & Airport Way
Purpose:Carries highway and pedestrian walkway over railroad
Route classification:Minor Arterial (Urban) [16]
Length of largest span:100.1 ft. [30.5 m]
Total length:506.9 ft. [154.5 m]
Roadway width between curbs:34.1 ft. [10.4 m]
Deck width edge-to-edge:47.6 ft. [14.5 m]
Vertical clearance below bridge:23.0 ft. [7.0 m]
Owner:City or Municipal Highway Agency [04]
Year built:1981
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Number of main spans:6
Main spans material:Concrete [1]
Main spans design:Box Beam or girders - Single or Spread [06]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:6,596 [as of 2009]
Truck traffic:10% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:53.5 tons [48.6 metric tons]
Inventory rating:31.7 tons [28.8 metric tons]
Sufficiency rating:94.8
Estimated cost of work:$1,662,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,900 [as of 1974]
Truck traffic:5% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:98.6
Estimated cost of work:$1,662,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,900 [as of 1974]
Truck traffic:5% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:98.6
Estimated cost of work:$1,662,000