Share:

MCGILVRA BLVD E over RAVINE

Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:MCGILVRA BLVD E over RAVINE
Structure number:085383000000000
Location:1000 McGilvra Blvd E
Route classification:Minor Arterial (Urban) [16]
Length of largest span:60.0 ft. [18.3 m]
Total length:200.1 ft. [61.0 m]
Roadway width between curbs:11.5 ft. [3.5 m]
Deck width edge-to-edge:18.4 ft. [5.6 m]
Owner:City or Municipal Highway Agency [04]
Year built:1967
Historic significance:Historical significance is not determinable at this time [4]
Number of main spans:5
Main spans material:Aluminum, Wrought Iron or Cast Iron [9]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,208 [as of 2009]
Truck traffic:10% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:40.6 tons [36.9 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:70.9
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$410,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1,000 [as of 1993]
Truck traffic:5% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:40.6 tons [36.9 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:65.9
Estimated cost of work:$410,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:900 [as of 1972]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Inventory rating:24.8 tons [22.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:65.9
Estimated cost of work:$410,000