BRIDGE STREET over STUCK RIVER

Map 

Coordinates:
+47.20394, -122.24562
47°12'14" N, 122°14'44" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:BRIDGE STREET over STUCK RIVER
Structure number:085419000000000
Location:0.3 E JCT SR 167
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:220.2 ft. [67.1 m]
Total length:359.9 ft. [109.7 m]
Roadway width between curbs:20.0 ft. [6.1 m]
Deck width edge-to-edge:21.0 ft. [6.4 m]
Vertical clearance above deck:15.7 ft. [4.8 m]
Owner:City or Municipal Highway Agency [04]
Year built:1927
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:9,400 [as of 2010]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:31.7 tons [28.8 metric tons]
Inventory rating:18.8 tons [17.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:30.7
Estimated cost of work:$1,004,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,076 [as of 1988]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:19.8 tons [18.0 metric tons]
Inventory rating:19.8 tons [18.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:52.3
Estimated cost of work:$1,004,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,000 [as of 1988]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:24.8 tons [22.5 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:60.7
Recommended work:Replacement of bridge or other structure because of relocation of road. [32]
Estimated cost of work:$1,004,000