45TH AVE NE over THORNTON CREEK
Map
Coordinates:
+47.69910, -122.2800547°41'57" N, 122°16'48" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | 45TH AVE NE over THORNTON CREEK |
| Structure number: | 085598000000000 |
| Location: | 45th Ave NE & NE 97th St |
| Purpose: | Carries highway over waterway |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 28.9 ft. [8.8 m] |
| Total length: | 43.0 ft. [13.1 m] |
| Roadway width between curbs: | 24.0 ft. [7.3 m] |
| Deck width edge-to-edge: | 32.5 ft. [9.9 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1949 |
| Historic significance: | Historical significance is not determinable at this time [4] |
| Design load: | M 13.5 / H 15 [2] |
| Number of main spans: | 3 |
| Main spans material: | Concrete [1] |
| Main spans design: | Tee beam [04] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 2,000 [as of 2009] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 62.4 tons [56.7 metric tons] |
| Inventory rating: | 37.6 tons [34.2 metric tons] |
| Sufficiency rating: | 80.0 |
| Estimated cost of work: | $95,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,000 [as of 1981] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 62.4 tons [56.7 metric tons] |
| Inventory rating: | 37.6 tons [34.2 metric tons] |
| Sufficiency rating: | 80.0 |
| Estimated cost of work: | $95,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 1,000 [as of 1981] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 37.6 tons [34.2 metric tons] |
| Inventory rating: | 23.8 tons [21.6 metric tons] |
| Sufficiency rating: | 67.6 |
| Estimated cost of work: | $95,000 |