Share:

IH 94 WB-E-W FREEW over LRD STORY PARKWAY

Map 

Coordinates:
+43.03259, -87.97387
43°01'57" N, 87°58'26" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:IH 94 WB-E-W FREEW over LRD STORY PARKWAY
Structure number:B40003700000000
Location:0.3M W JCT USH 41 TO N
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:44.6 ft. [13.6 m]
Total length:51.8 ft. [15.8 m]
Roadway width between curbs:74.2 ft. [22.6 m]
Deck width edge-to-edge:77.4 ft. [23.6 m]
Vertical clearance below bridge:15.1 ft. [4.6 m]
Skew angle:17°
Owner:State Highway Agency [01]
Year built:1958
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Main span material:Concrete continuous [2]
Main span design:Frame [07]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:76,720 [as of 2007]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:62.4 tons [56.7 metric tons]
Inventory rating:37.4 tons [34.0 metric tons]
Sufficiency rating:83.0

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:79,950 [as of 1996]
Truck traffic:6% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:62.4 tons [56.7 metric tons]
Inventory rating:37.4 tons [34.0 metric tons]
Sufficiency rating:83.0

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:57,730 [as of 1979]
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:67.3 tons [61.2 metric tons]
Inventory rating:37.6 tons [34.2 metric tons]
Sufficiency rating:94.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]