Share:

USH 41 SB over IH RAMP IH 94WB-STH 341S

Map 

Coordinates:
+43.03333, -87.97000
43°01'60" N, 87°58'12" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:USH 41 SB over IH RAMP IH 94WB-STH 341S
Structure number:B40004900020000
Location:STADIUM INTERCHANGE
Purpose:Carries highway overpass (third level) over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:87.9 ft. [26.8 m]
Total length:215.2 ft. [65.6 m]
Roadway width between curbs:33.8 ft. [10.3 m]
Deck width edge-to-edge:36.7 ft. [11.2 m]
Vertical clearance below bridge:13.8 ft. [4.2 m]
Owner:State Highway Agency [01]
Year built:1959
Year reconstructed:1998
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,400 [as of 2007]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.1 tons [43.7 metric tons]
Inventory rating:28.5 tons [25.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:82.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,305,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:15,430 [as of 1979]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.1 tons [43.7 metric tons]
Inventory rating:28.5 tons [25.9 metric tons]
Sufficiency rating:79.9

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:15,430 [as of 1979]
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:66.3 tons [60.3 metric tons]
Inventory rating:40.6 tons [36.9 metric tons]
Sufficiency rating:84.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]