LRD W BROWN ST over IH 43-N-S FREEWAY
Map
Coordinates:
+43.05667, -87.9250043°03'24" N, 87°55'30" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | LRD W BROWN ST over IH 43-N-S FREEWAY |
| Structure number: | B40021500000000 |
| Location: | 0.7M E JCT STH 57 |
| Purpose: | Carries highway and pedestrian walkway over highway |
| Route classification: | Local (Urban) [19] |
| Length of largest span: | 84.0 ft. [25.6 m] |
| Total length: | 288.4 ft. [87.9 m] |
| Roadway width between curbs: | 45.9 ft. [14.0 m] |
| Deck width edge-to-edge: | 60.0 ft. [18.3 m] |
| Vertical clearance below bridge: | 17.4 ft. [5.3 m] |
| Skew angle: | 22° |
| Owner: | State Highway Agency [01] |
| Year built: | 1967 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 4 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 700 [as of 2007] |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 48.1 tons [43.7 metric tons] |
| Inventory rating: | 28.5 tons [25.9 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 73.5 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $1,474,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,600 [as of 1979] |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 51.5 tons [46.8 metric tons] |
| Inventory rating: | 29.7 tons [27.0 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 70.2 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 3,600 [as of 1979] |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 71.3 tons [64.8 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 66.2 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |