CTH E EB SILVER over STH 145-W FOND DU LAC AV

Map 

Coordinates:
+43.11967, -88.01241
43°07'11" N, 88°00'45" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:CTH E EB SILVER over STH 145-W FOND DU LAC AV
Structure number:B40025300000000
Location:1.1M E JCT USH 41
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:94.2 ft. [28.7 m]
Total length:262.2 ft. [79.9 m]
Roadway width between curbs:36.1 ft. [11.0 m]
Deck width edge-to-edge:44.6 ft. [13.6 m]
Vertical clearance below bridge:15.4 ft. [4.7 m]
Skew angle:43°
Owner:State Highway Agency [01]
Year built:1964
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Low slump Concrete [4]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,800 [as of 2007]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:62.4 tons [56.7 metric tons]
Inventory rating:32.1 tons [29.2 metric tons]
Sufficiency rating:81.5

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,140 [as of 1979]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:62.4 tons [56.7 metric tons]
Inventory rating:32.1 tons [29.2 metric tons]
Sufficiency rating:93.8
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$716,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,140 [as of 1979]
Deck condition:Poor [4 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Serious [3 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:69.3 tons [63.0 metric tons]
Inventory rating:37.6 tons [34.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:47.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,010,000