CTH W PP GOOD HOPE over MENOMONEE RIVER

Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:CTH W PP GOOD HOPE over MENOMONEE RIVER
Structure number:B40039400000000
Location:0.3M W JCT USH 41-45
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:47.9 ft. [14.6 m]
Total length:146.7 ft. [44.7 m]
Roadway width between curbs:27.9 ft. [8.5 m]
Deck width edge-to-edge:44.0 ft. [13.4 m]
Owner:County Highway Agency [02]
Year built:2001
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

Latest Available Inspection: July 2014 

Status:Open, no restriction [A]
Average daily traffic:13,086 [as of 2012]
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Structural appraisal:Equal to present desirable criteria [8]
Deck geometry appraisal:Basically intolerable requiring high priority of corrrective action [3]
Water adequacy appraisal:Superior to present desirable criteria [9]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:53.9 tons [49.0 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:78.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,177,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
July 201478.6Functionally obsoleteGoodVery GoodVery Good13086
August 201276.6Functionally obsoleteGoodVery GoodVery Good13086
August 201079.0Functionally obsoleteGoodVery GoodVery Good27000
July 200879.0Not deficientVery GoodVery GoodVery Good27000
June 200679.0Not deficientVery GoodVery GoodVery Good27000
May 200479.0Not deficientVery GoodVery GoodVery Good27000
May 200279.0Not deficientVery GoodVery GoodVery Good27000
July 200179.0Not deficientVery GoodVery GoodVery Good27000